We – EPG Team the greatest gearbox & motors , couplings and gears manufacturing unit in China with 5 distinct branches. For far more details: Mobile/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778083988828
Product Description
MC rewinding electric powered motors
Advantage:
one. Very good overall performance
2. Risk-free & reliable procedure
3. Nice appearance
4. Low sounds
five. Tiny vibration
6. Light weight & simple building
Software:
MC sequence starter motor can be utilised on air compressor, pumps, refrigeration, health care equipment and instruments, and a lot of other devices that want complete-load commence.
Operating Problems:
one. Ambient temperature: -15º C≤ ≤ 40º C
2. Altitude: ≤ 1000m
3. Rated voltage: 220V
four. Rated frequency: 50Hz/60Hz
five. Obligation: Steady(S1)
6. Insulation class: Class B/F
seven. Safety course: IP44/IP54/IP55
8. Cooling approach: IC0141
Notice: If you have any unique specifications, you should speak to us.
Model | Output | Existing | Power | Eff | Speed | Tstart/Tn | Ist/In | ||
KW | HP | (A) | Factor | (%) | (r/min) | ||||
MC711-two | .18 | .24 | 1.89 | .seventy two | 60 | 2750 | 3 | six.five | 1.8 |
MC721-2 | .25 | .33 | two.4 | .74 | sixty four | 2770 | three | six.5 | 1.8 |
MC801-2 | .37 | .five | 3.36 | .77 | sixty five | 2800 | two.eight | six.five | 1.eight |
MC802-two | .55 | .seventy five | 4.65 | .seventy nine | sixty eight | 2810 | two.eight | six.five | one.8 |
MC90S-two | .seventy five | 1 | six.09 | .8 | 70 | 2820 | two.5 | 6.5 | 1.eight |
MC90L-two | 1.1 | one.five | eight.sixty eight | .eight | seventy two | 2820 | 2.five | six.5 | one.8 |
MC100L1-2 | 1.five | 2 | 11.four | .eighty one | 74 | 2830 | two.5 | seven | 1.8 |
MC100L2-two | two.two | 3 | 16.5 | .81 | 75 | 2830 | 2.2 | seven | one.8 |
MC112-2 | three | 4 | 21.nine | .82 | seventy six | 2840 | 2.two | 7 | 1.eight |
MC711-four | .12 | .sixteen | 1.88 | .fifty eight | fifty | 1350 | 3 | six | 1.8 |
MC721-four | .eighteen | .24 | two.49 | .62 | 53 | 1370 | 3 | six | one.eight |
MC801-4 | .twenty five | .33 | 3.eleven | .63 | fifty eight | 1400 | 2.8 | six | one.eight |
MC802-4 | .37 | .5 | four.24 | .64 | sixty two | 1410 | 2.8 | six | 1.8 |
MC90S-four | .fifty five | .seventy five | 5.forty nine | .sixty nine | sixty six | 1420 | 2.five | six | one.8 |
MC90L-four | .seventy five | 1 | 6.87 | .seventy three | 68 | 1420 | 2.five | six | one.eight |
MC100L1-4 | one.one | 1.five | nine.52 | .74 | 71 | 1430 | 2.five | 6.5 | one.eight |
MC100L2-four | one.five | 2 | 12.five | .seventy five | seventy three | 1430 | two.5 | 6.five | 1.eight |
MC112-4 | 2.two | 3 | seventeen.eight | .76 | 74 | 1440 | two.2 | 6.5 | one.eight |
SPARE Areas:
PAC ept Techniques
FAQ
Q: Do you supply OEM provider?
A: Yes
Q: What is your payment term?
A: 30% T/T in progress, 70% equilibrium when receiving B/L copy. Or irrevocable L/C.
Q: What is your guide time?
A: About 30 times following receiving deposit or authentic L/C.
Q: What certifiicates do you have?
A: We have CE, ISO. And we can use
The use of first products manufacturer’s (OEM) portion quantities or logos , e.g. CASE® and John Deere® are for reference needs only and for indicating solution use and compatibility. Our firm and the outlined substitute components contained herein are not sponsored, authorized, or made by the OEM.