R series Helical Geared Motor Qualities
one. Functions:
1. High efficiency: ninety two%-97%
two. Compact composition: Small offset output, two stage and three stage are in the very same box.
3. High precision: the equipment is created of high-high quality alloy metal forging, carbonitriding and hardening treatment, grinding method to ensure substantial precision and stable operating.
4. High interchangeability: highly modular, serial design, powerful versatility and interchangeability.
2. CZPT parameters
Ratio | three.forty one-289.seventy four |
Input electrical power | .twelve-160KW |
Output torque | sixty one-23200N.m |
Output speed | five-415rpm |
Mounting kind | Foot mounted, flange mounted, foot and flange mounted, solitary-phase foot mounted, solitary stage flange mounted, Flange-mounted with extended bearing hub |
Input Approach | Flange enter(AM), shaft enter(Ad), inline AC motor enter, or AQA servo motor |
Brake Launch | HF-handbook launch(lock in the brake launch place), HR-handbook launch(autom-atic braking situation) |
Thermistor | TF(Thermistor protection PTC thermisto) TH(Thermistor safety Bimetal swotch) |
Mounting Placement | M1, M2, M3, M4, M5, M6 |
Variety | R17-R167 |
Output shaft dis. | 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm |
Housing materials | HT200 substantial-energy cast iron from R37,forty seven,fifty seven,sixty seven,seventy seven,87 |
Housing materials | HT250 Higher toughness solid iron from R97 107,137,147,157,167,187 |
Heat treatment technology | carbonitriding and hardening remedy |
Efficiency | 92%-97% |
CZPT | VG220 |
CZPT Class | IP55, F class |
CZPTshine CZPT
ZheJiang CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned armed forces mould business, was set up in 1965. CZPTshine specializes in the full energy transmission answer for higher-end gear production industries based mostly on the purpose of “System Item, Application Layout and Professional Services”.
CZPTshine have a sturdy complex drive with in excess of 350 workers at current, like over thirty engineering technicians, thirty quality inspectors, covering an area of 80000 square meters and types of innovative processing devices and screening equipments. We have a good basis for the business application improvement and provider of higher-stop speed reducers & variators possessing to the provincial engineering engineering research center,the lab of gear velocity reducers, and the base of modern day R&D.
Our Group
CZPT Management
CZPT:Insist on Improvement,Strive for CZPT With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
CZPT policy:to enhance the overall level in the field of power transmission
CZPT View:Continuous Improvement , pursuit of excellence
CZPT Philosophy:CZPT creates value
3. Incoming CZPT Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, subCZPT goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
4. Process CZPT Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
product is a product inspection to determine the qualified products.
7. Certification.
Packing
Shipping